The First 90 Days After Solar Commissioning

What to monitor, document, inspect, and discuss after a solar plant begins operating.

24 August 2026 1 min read Uncategorized
The First 90 Days After Solar Commissioning

The first months of operation establish the plant baseline. They are the right time to confirm expected behaviour, close documentation gaps, and help the operating team become confident with the system.

Confirm the performance baseline

Review generation, availability, inverter behaviour, meter readings, and major alerts against the approved design assumptions and actual weather conditions.

Complete the handover record

Keep as-built drawings, test reports, warranties, equipment schedules, approvals, passwords, training records, and maintenance instructions together.

Set a practical maintenance rhythm

Define cleaning, inspection, vegetation, thermography, electrical testing, and reporting schedules based on the site environment and equipment requirements.